SITE PREPARATION AND INSTALLATION 3 - 37
Install Checkpoint Antenna
The Checkpoint EAS single axis wire loop antenna should be looped around the middle housing of the
MP6000, under the platter, and should route through the pinch points as shown in Figure 3-47. There is no
vertical antenna. (See Scale Cable Channel on page 1-10 for cable assembly routing.)
The antenna leads, with partly-stripped ends, should be ro
uted as pictured, hanging several inches below the
MP6000 so that the Checkpoint controller lead wires can tie into the antenna.
A cable with two additional leads is available to support
Interlock features. The Interlock cable assembly part
number is CB000002A01, orderable as CBA-A54-S01EAR (includes a connector, and a pigtail for Checkpoint).
Contact your local Checkpoint represent
ative to install the EAS cable to the Checkpoint System. Refer to the
Checkpoint device documentation for details about its functionality.
Figure 3-47
Checkpoint Antenna Installation
Installed
Checkpoint
Antenna
Pinch
Points